Nie wieder prokastinieren mit unseren Lernerinnerungen. Stop procrastinating with our smart planner features. The unique appearance created some challenges in making the stadium feasible. They were more deprived compared to the rest of the UK. Regeneration included; The Olympic stadium; aquatics centre; hockey centre; accommodation for athletes (the Olympic village) and 150mn development for Stratford Station. Due to the increased tourism generated by the Olympic games it has also caused more tourism all over the UK in places such as York. <>]/P 495 0 R/Pg 490 0 R/S/Link>> The Athlete's Village has been made into a housing estate, now called the East Village. Do I need a completion certificate for building work in my house? This angered the public as the money also came from taxpayers. What if I haven't received the joining instructions? "Who's who: Political credit from London Olympics". Who do I contact if I have invoicing queries? Can I appeal if my Full Plans application is rejected? ALL of the Olympic venues have been sold. endobj 332 0 obj opportunity to improve the area with the transformations. East Village is one of the most sustainable communities in the UK. Do I need to tell my neighbours about my building work? 17 0 obj Affordable rent was seen as 80% of the market rent by the government. Olympic Park case study London The Olympic Park, renamed Queen Elizabeth Olympic Park after the Olympics and Paralympics, was built for the 2012 Summer Olympics and Paralympics. 480 0 obj Introducing LABC Trainee of the Year 2016: Jack Pritchard! o 1.5 billion to run the Games. AppendPDF Pro 5.5 Linux Kernel 2.6 64bit Oct 2 2014 Library 10.1.0 0000002812 00000 n During the bidding process, it was proposed that the games would increase the number of British people participating in sports, which would have both social and health benefits. 90% of the material by weight that arose from demolition work was to be reused or recycled, including bricks, steel frames, and stone paving. Urban Regeneratio n and the Games Olympic Park Site - much of the 500 acre site is polluted brownfield (Photos 10 and 11), it will be At least 60 Games-related projects promoted greener travel, including a GBP 10 million investment to upgrade pedestrian and cycling routes across London. Does the Awards entry form have to be completed by my local authority building control surveyor? In practice, this meant leveraging the underpinning technology stack of Wi-Fi and DAS at the venue by delivering a cohesive and holistic roadmap for how consumer facing digital technologies could be deployed to the end goal. TRUE or FALSE:The Olympic Village was converted into 2,800 flats and apartments, and new developments such as The International Quarter will provide 7,000 additional homes on the edge of the park. (Video). Create the most beautiful study materials using our templates. PART 2: Health & Safety Management Case Study - Olympic Games London 2012 Established in 2006, the ODA (Olympic Delivery Authority) was the public body responsible for the construction of the new venues and infrastructure required for London 2012, setting a precedence for health & safety, as well as environmental management throughout. Write a letter to the International Olympic Committee explaining why you do or dont want the Games to come to London. <>]/P 324 0 R/S/Link>> Explain what the legacy for the sports venues was? Help - we didn't get permission for our building work! Upload unlimited documents and save them online. 2 Objectives The ODA had five years to staff up, procure and deliver around 6bn of major construction works . With sustainability and biodiversity in mind, vegetation suited to an urban environment was chosen, and 4,000 trees were planted. One of the main aims of the Olympics was to be the most sustainable Games ever. Location of main venue just seven minutes by train from Central London, Londons bid was one of the most compact Olympic Parks only about 2 square kilometres, so minimal impact on land use in the area, Sizeable available brownfield sites for redevelopment, as well as the green spaces of the Lower Lea Valley, so there would be opportunity for further growth, Development of a major transport hub in the form of Stratford International Station, The athletes village was planned to be converted into 2818 new homes, of which about 40% would be affordable homes for low and middle income families and disabled people, Emphasis on urban regeneration: the swimming pools were planned for conversion into public pools after the Games, Suitable location for further post-Games industry e.g. Social - new homes were built, with around 1/3 of those becoming more affordable. 0000001098 00000 n Im having difficulty uploading my photographs for my Awards entry. but its impact adversely affected some of its population. During his time as the Mayor of London, Ken Livingstone said the below, showing the potential of hosting the Olympics. Areas such as Stratford, Bow, Leyton and Hackney Wick were deprived areas with the need for regeneration. What is the status of any regulatory work done in a period where an Approved Inspector fails to secure renewal of their insurance? We will be looking into this case study in more detail right now. Can I do this? London Aquatic Center. It was one of the most deprived communities in the country, unemployment was high, and health levels were poor. <> Will you pass the quiz? 2012 Summer Olympics and Paralympics were no different. endobj How do I know which local authority and LABC region my project is in? Hosting the Olympic and Paralympic Games has historically been related to spending a lot of money. It was one of the most deprived communities of the UK, it had a high population density, low annual income, high unemployment, it had readily available waste and industrial lands for building, and it was located only 7 minutes from the City. SWOT Analysis stands for - Strengths, Weaknesses, Opportunities, and Threats . West Ham United F.C. These charging stations are used today for emission-free travel. Economically, the Games occurred during the recovery from the global financial crisis of 2008-10, and many people felt that the approximate cost of GBP10bn to be too high, despite the lasting benefits to the environment and the future of the economy. The reason being the stadium lost value by 381 million between 2014 and 2020 and cannot make a profit as estimated. endobj 484 0 obj The area was therefore identifiably in need of regeneration and expected to benefit from improvements to infrastructure that would mean: Whether the Games were cost-effective depends very much on the perspective of the individual. The Olympic games had a relatively positive impact on the area, with new houses, shops, and schools. To accommodate the new roof, theexisting structure had to be altered significantly, particularly around the compression ring at the top of thestadium and the project team worked collaboratively to identify how to strengthen the structure to meetrequirements. 481 0 obj Completed in 2011 in London, United Kingdom. Stratford lacked proper infrastructure, and the environmental quality was poor. Which 3 legacies were planned in the bidding process? This was done by comparing indicators of the London average on topics such as creating wealth and reducing poverty, supporting healthier lifestyles, and developing thriving neighbourhoods in the areas where the Olympic Park is situated. The water quality in the River Lea that runs through the Olympic Park was also improved, and green areas were placed alongside the river. Disability organisations, such as the Autism Awareness Campaign UK, believed that the Olympic and the Paralympic games would encourage people with any disability to take up sports. After the games, the temporary venues were removed, and existing infrastructures were changed to become more permanent structures. Do you consider that the Games were a sustainable event? London has great wealth and experience in putting on large events and is used to welcoming visitors from around the world, so it was organisationally capable of running the Olympics. Will my building project need Building Regulations approval? JLAB was an integral part of the design and construction team,attending weekly design team meetings and utilising the programme Tracker to access documents. <>]/P 321 0 R/Pg 504 0 R/S/Link>> 520 0 obj I've been affected by the expiry of my Approved Inspector's insurance - what do I do? Construction of all of the buildings mentioned above created 1,500 jobs, with at least 30% of that workforce being local residents. Sign up to highlight and take notes. The organiser proposed that 3,000 new permanent jobs would be created by this event. People forcibly moved out of houses which destroyed communities, Worlds largest urban park in the world to offer free Wi-Fi to all visitors. The Olympic development covers an area approximately of 250 hectares and houses the Olympic Stadium, Aquatics Centre, Velodrome, Copper Box, BMX Track, Eton Manor and Riverbank Arena together with sponsors hospitality, the international broadcast centre/main press centre complex, the Orbit Tower, extensive public access areas (landscaped & What is a building control surveyor and how do I get to be one? With events ranging from Premier League football via anchor tenant West Ham United, Major League Baseball, concerts and global athletics events, the stadium turned to PTI to ensure that consumer experience could flexibly meet the demands of the different event types . The following factors were partly responsible for the success of the bid: A further issue was the very local focus of Londons bid. Wihbey, J. A concept inspired by the fluid geometry of water in motion, creating spaces and a surrounding environment in sympathy with the river landscape of the Olympic Park. Sydney Olympics Beijing Olympic Stadium London Olympics Twickenham (UK) Swedbank Arena Project (Sweden) Commonwealth Games (UK) . Chobham Academy, a school for students aged 3-18, was able to open in the East Village. It is written by John T. Gourville, Marco Bertini and deals with topics in areas such as Sales & Marketing Pricing. What does it cost to cancel an initial notice and revert work to my local council? What are the entry requirements for the 2021 awards? Why can I choose who does my building control? The Stadium is located in the Olympic Park in Stratford, London, on a 40 hectare, island that resembles a diamond in the south area of the Olympic park. Create flashcards in notes completely automatically. The athletes used electric vehicles, and 120 charging stations were placed, becoming the UK's most extensive network of charging points. "I didn't bid for the Olympics because I wanted three weeks of sport, I bid for the Olympics because it's the only way to get the billions of pounds out of the government to develop the east end. These ships could not navigate down as far as the Royal Docks. The aftermath of the 2012 Olympic games has been quite a positive one, even though some of the changes that happened were short-lived. There are a lot of green spaces, from the Queen Elizabeth Olympic Park to the Hackney Marshes. Generally speaking, yes. It was built alongside the Water Polo Arena and opposite the Olympic Stadium on the opposite bank of the Waterworks River. 0000001219 00000 n The Olympic Village was converted into more than 2,800 flats in 11 residential plots, with spacious courtyards, gardens and balconies. 461 0 obj The original stadium had 25,000 permanent seats on the lower tier and 55,000 temporary seats on theupper tier. endobj Impacts of changing trends in resource consumption, Multidimensional development and the SDGs, Patterns and trends in leisure and tourism, Leisure hierarchy and sphere of influence, 3. Green areas were created along the river banks. The charging stations continue to support emission-free travel long after the Games. Regeneration - many houses deemed 'affordable' were not actually affordable to the majority of the people, only the more affluent people. existing waste and industrial land, was the reason it was chosen in the UK's bid to host the 2012 Olympic and Paralympic Games. The regeneration cleaned up the urban wasteland to provide for the Olympic park. Content Copyright 2023 PTI Digital UK Ltd. All Rights Reserved. LDSA (London District Surveyors' Association). <]>> PTI consulted across the technology estate, for all requirements in bowl and throughout concourses, including the Stadium IPTV network and at food and beverage concessions, integrating services such as Click & Collect in general admission seats, and to-seat ordering in hospitality, as well as optimising digital menu boards and ePOS integration. (LogOut/ <>]/P 320 0 R/Pg 504 0 R/S/Link>> Eventually, some 8,000 people will be able to live in the 5 new neighbourhoods created from the Olympic Parkland. This led to the multiplier effect. 3 - Location of the Olympic Park Google Earth (2022). <>]/P 327 0 R/Pg 504 0 R/S/Link>> Some buildings were converted while others were moved to other parts of the country. Negatives: The Olympic stadium is estimated to have cost 701 million pounds, almost 3 times the original estimate. endobj An impressive 85 per cent of UK schools signed up to this programme. Be part of the most significant change in construction in more than 30 years. Over 1,000 new trees were planted in East London. What happens if I only find out my AI has no insurance once the works are completed? The conversion of the Olympic Village Polyclinic into a lifelong learning centre for the East London Community. The International Quarter, a business development housing companies such as Transport for London and the Financial Conduct Authority (FCA) bring the total number of jobs in the area to 25,000. 2012 was about the Olympic Games and also about the Paralympic Games. The final building to be sold off was the 300m media centre, which will now primarily house Infinity - a data company who want to store information for large corporations. Steel. When the Metropolitan Building Act restricted dangerous and toxic industries from operating in the metropolitan area, many businesses relocated to the river banks. Why do I have to pay twice once for the Approved Inspector and then for the LABC team? This made it an ideal location for putting up the park, especially since it was located only seven minutes from Central London. The Olympic stadium ended up costing almost 3 times more than initially estimated: 701 million. The London Legacy Development Cooperation delivered the Queen Elizabeth Olympic Park which hostedthe London 2012 Olympic Games and is responsible for bringing it back in to use. London's Olympic Park has been regenerated by changing the functions of the infrastructure of the Olympic Games to serve the public and the local residents. endobj The aquatics centre and its 50m pool can now be used by the community, schools and athletes alike. The 2012 Summer Olympics and Paralympics were no different. With the gentrification of the area and the promises of "affordable" housing, it seems to benefit some people, not all. 4.3 Case 3 - Murrayfield stadium project (2018) . Create beautiful notes faster than ever before. Case study: London Olympics 2012: Learning activities Questions Other tasks Going further Why was London chosen? 300,000 plants were planted in the Olympic Parks wetland area. endobj Regenerating business developments to house companies such as Transport for London and the Financial Conduct Authority (FCA) bring _____ to the area. Explain your answer. The Olympic stadium is now the London Stadium, home to the Premier League football club, West Ham United. Tourism and sport at the international scale, Tourism as a national development strategy, Case study: Kenyas national tourism strategy, Unsustainable tourism and carrying capacity, Sustainable management of tourism hotspots, Features of the Central Business District, Economic activity in the Central Business District, Urban poverty, deprivation and informal activity, Case study: Urban problems in New York City, Case study: Urban problems in Nairobi, Kenya, Case study of infrastructure growth: Hong Kong introduction, Case study of transport infrastructure: Hong Kong, Case study of telecommunications infrastructure: Hong Kong, Case study of energy infrastructure: Hong Kong, Case study of water supply and sanitation infrastructure: Hong Kong, 3.
Japanese Detective Names,
Notting Hill Carnival 2022 Cancelled,
Brattleboro Breaking News,
Winchester High School College Matriculation,
Shannon Miller Nbc Ct Husband,
Articles L